  • GIYANI SECTION A (NYAGELANI)

    PROJECT NAME: GIYANI SECTION A (NYAGELANI) Upgrading of Streets from Gravel to Asphalt Surfaced Roads and Installation of Stormwater Pipes

    Client Name: Greater Giyani Municipality
    Project Value: R 30 million

    PROJECT MOTIVATION

    The gravel roads in Giyani Section A had deteriorated, causing steep costs and inconvenience to road users. Stormwater from nearby hillside had caused damage to properties. SHUMBA ENGINEERING SERVICES was appointed by the Greater Giyani Municipality to plan, conceptualize, design, contract administer and monitor construction of this project. The project entailed upgrading of 7 km of gravel road to asphalt surfaced road, and installation of 4 km of stormwater pipes. The project was successfully completed within the budget, time and to the best quality.

    SES 010 P1 Roadbed Preperation 01
    SES 010 P3 Mass Earthworks 02
    SES 010 P7 Stabilisation In Progress 01
    SES 010 P8 Priming In Progress 01
    SES 010 P10 Priming In Progress
    SES 010 P12 Compaction Of Surfacing In Progress
    SES 010 P17 Material Stockpile For Layer Works

  • MANDELA PARK STREET PAVING

    PROJECT NAME: MANDELA PARK STREET PAVING Upgrading of street from gravel to interlocking brick paved road and related stormwater management

    Client Name: Greater Letaba Municipality
    Project Value: R 6 million

    PROJECT MOTIVATION

    Mandela Park Township is located in a hilly and steep terrain. This area receives fairly high annual rainfall. It is difficult to drive in the area and more so when there is at least little rainfall to wet the ground. SHUMBA ENGINEERING SERVICES was appointed by the Greater Letaba Municipality to plan, conceptualise, design, contract administer and monitor construction of this project. The project entailed upgrading of 2 km of gravel road to interlocking brick paved road, and installation of stormwater drains and culverts. The project was successfully completed within the budget, time and to the best quality.

    SES 009 P2 Earthworks
    SES 009 P3 Roadbed Preperation
    SES 009 P6 Culvert At CH 258
    SES 009 P9 Interlocking Brick Paving
    SES 009 P8 Road Layer Works In Progress
  • Lehlokwaneng Tswaing Access Bridge

    PROJECT NAME: Lehlokwaneng Tswaing Access Bridge

    Client Name: Lepllle Nkumpi Local Municipality
    Project Value: R 7 million

    PROJECT MOTIVATION

    The experience of being disconnected from fellow community members and school due to a flowing river is a painful one. Hlakaro River passes through Lehlokwaneng and Tswaing Villages and would frequently flood during the rain season. Vehicles and pedestrians would not be able to cross the river for a prolonged period when the flood level was high. SHUMBA ENGINEERING SERVICES (SES) was appointed by the Municipality to provide a solution to lessen the burden of pain caused to the community of Lehlokwaneng Tswaing by the prolonged high level of river flooding. SES planned, conceptualised, design, prepared bid and construction, and administered construction for a project across the Hlakaro River.

    SES 026 P1 Shuttering In Place And Ready To Pour Concrete
    SES 026 P2 Rock Fill For Foundations
    SES 026 P3 Setting Out At The Bridge
    SES 026 P10 Reinforcement For Bridge Deck In Place
 

Buildings (Civil & Structural)

  • BEITBRIDGE PRIMARY SCHOOL

    PROJECT NAME: Beitbridge Primary School

    Client Name: IDT & Limpopo Department of Education
    Project Value: R 24 million

    PROJECT MOTIVATION

    SHUMBA ENGINEERING SERVICES (SES) was appointed by IDT as the Civil and Structural Engineers for the upgrading of Beitbridge Primary School. SES performed civil and structural design, contract administration and construction monitoring duties, resulting in school infrastructure which included the following:

    • 24 new classrooms
    • Administration block
    • Nutritional centre
    • Palisade fencing
    • Access roads
    • 20 waterborne toilets

    SES 014 BB P3
    SES 014 BB P4
    SES 014 BB P5
    SES 014 BB P8
    SES 014 BB P9
  • DZATA SECONDARY SCHOOL

    PROJECT NAME: Dzata Secondary School

    Client Name: IDT & Limpopo Department of Education
    Project Value: R 18 million

    PROJECT MOTIVATION

    SHUMBA ENGINEERING SERVICES (SES) was appointed by IDT as the Civil and Structural Engineers for the upgrading of Dzata Secondary School. SES performed civil and structural design, contract administration and construction monitoring duties, resulting in school infrastructure which included the following:

    • 12 classrooms
    • Administration block
    • Nutrition centre
    • 8 renovated classrooms
    • Stormwater channels
    • Septic tank sewer system
    • SES 014 DZA P3
      SES 014 DZA P5
      SES 014 DZA P2
      SES 014 DZA P6
      SES 014 DZA P8
      SES 014 DZA P9
  • LULEKANI MAGISTRATE COURT

    PROJECT NAME: GLulekani Magistrate Office

    Client Name: National Department of Public Works
    Project Value: R 9.57 million

    PROJECT MOTIVATION

    The National Department of Public Works realised the need for repair and renovation works at Lulekani Magistrate Office.SHUMBA ENGINEERING SERVICES (SES) was appointed as the civil engineering consultant as part of a multi-disciplinary team for the project. SES assessed the existing infrastructure and produced the scope of work and services report for civil infrastructure that was discussed and finalised with the Client. The civil infrastructure comprised water provision, sewer, access roads, paved parking and stormwater drainage. SES conceptualised, designed, contract administered, and construction monitored the civil engineering aspects of the project, until the project was complete.

    SES 006 P2
    SES 006 P3
    SES 006 P4
    SES 006 P5
  • GOGOBOLE PRIMARY SCHOOL

    PROJECT NAME:Gogobole Primary School

    Client Name: IDT & Limpopo Department of Education
    Project Value: R 11.7 million

    PROJECT MOTIVATION

    SHUMBA ENGINEERING SERVICES (SES) was appointed by IDT as the Civil and Structural Engineers for the upgrading of Gogobole Primary School. SES performed civil and structural design, contract administration and construction monitoring duties, resulting in school infrastructure which included the following:

    • 16 new classrooms
    • Nutritional Centre
    • Computer Science Centre
    • Septic tank sewer system

    SES 014 GOG P2
    SES 014 GOG P3
    SES 014 GOG P4
    SES 014 GOG P5
  • JAJI SECONDARY SCHOOL

    PROJECT NAME: Jaji Secondary School

    Client Name:IDT & Limpopo Department of Education
    Project Value: R 6 million

    PROJECT MOTIVATION

    SHUMBA ENGINEERING SERVICES (SES) was appointed by IDT as the Civil and Structural Engineers for the upgrading of Jaji Secondary School. SES performed civil and structural design, contract administration and construction monitoring duties, resulting in school infrastructure which included the following:

    • 5 new classrooms
    • Nutritional centre
    • Renovated classrooms
    • Access road
    • Stormwater
    • Septic tank sewer system

    SES 014 JAJ P1
    SES 014 JAJ P5
    SES 014 JAJ P8
    SES 014 JAJ P10

Sanitation

  • LIMPOPO PROVINCE HOUSEHOLD SANITATION

    PROJECT NAME: Limpopo Province Household Sanitation in Vhembe District

    Client Name: Lepelle Northern Water
    Project Value: R 10.4 million

    PROJECT MOTIVATION

    Sanitation is dignity. This is true as echoed in various documents by the South African Department of Water and Sanitation (DWS). Various villagers in the Vhembe District Municipality of the Limpopo Province were yearning for improvement of sanitation facilities. SHUMBA ENGINEERING SERVICES (SES) was appointed by Lepelle Northern Water (LNW) to provide sanitation facilities for various villages in the Vhembe District of the Limpopo Province. SES working with LNW and communities identified the appropriate level of sanitation facilities that would improve the lives of these communities. The appropriate level was Ventilated Improved Latrine (VIP). Thus, the use of ordinary pit latrines and bush facilities was replaced with a higher level of service, provision of VIP toilets. A total of 1013 VIP toilets were installed by SES and the dignity of the communities improved.

    Completed VIP Toilet Isometric View
    Front View of Completed VIP Toilet
    Inside View of Completed VIP toilet
    Pit Portion of VIP Toilet Under Construction
    Depth of VIP Toilet Being Verified
Gauteng Province Office
corporate@shumbaengineering.co.za

+27 11 802 0286

27 Muller Street North, Buccleuch Sandton, Johannesburg, 2090

Limpopo Province Office
corporate@shumbaengineering.co.za

+27 15 265 7003

Unit 10, 125 on Marshall Street, Polokwane, 0699

Newsletter Subscription

© 2019 SHUMBA ENGINEERING SERVICES
Follow us